2016
DOI: 10.1016/j.autcon.2015.10.013
|View full text |Cite
|
Sign up to set email alerts
|

4D CAD Based Method for Supporting Coordination of Urban Subsurface Utility Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
19
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
9

Relationship

1
8

Authors

Journals

citations
Cited by 25 publications
(20 citation statements)
references
References 38 publications
0
19
0
1
Order By: Relevance
“…Nowadays, local authorities most often own utilities of public water supply and sewerage systems while private service providers manage gas, electricity, communication systems. This fragmentation in ownership of utilities makes utility activities complex and reduces the control over them (Olde Scholtenhuis et al , 2016).…”
Section: Introductionmentioning
confidence: 99%
“…Nowadays, local authorities most often own utilities of public water supply and sewerage systems while private service providers manage gas, electricity, communication systems. This fragmentation in ownership of utilities makes utility activities complex and reduces the control over them (Olde Scholtenhuis et al , 2016).…”
Section: Introductionmentioning
confidence: 99%
“…A 4D schedule was also used in railway renovation in the Netherlands, where new structures (both temporary and permanent) had to be aligned with preexisting structures; this was assisted through 4D schedule and space conflict management in each phase of the project [10]. Furthermore, Olde et al [43] added ethnographic action research to 4D CAD in multiple project cases to support underground utility projects, which helped in conflict management while laying down new structures. In another study, Kassem et al [44] identified and solved logistics problems, along with temporal and spatial conflicts in workspace management, using a 4D tool.…”
Section: Modularizationmentioning
confidence: 99%
“…Another important discovery in this research is the prevention of conflict as an important step in effective management of conflict in program team. Although the importance of adequate project preparation (Duzkale & Lucko, 2016), knowledge management (Hackbarth, 1998), and digital technologies (Kassem et al, 2015;Scholtenhuis et al, 2016;Trebbe et al, 2015;L. Wang & Leite, 2016) have been stressed in previous researches, the prevention of conflict has never been suggested as one of the conflict solutions for effective conflict management.…”
Section: The Impacts Of Program Conflictmentioning
confidence: 99%
“…In order to solve the multiple objectives issue in a construction project, a Niched Pareto Genetic Algorithm (NPGA), was modified to facilitate the optimization of the schedule (Kim et al, 2016). The increased application of 4D and building information modeling (BIM) technologies, many digital tools have been introduced into workspace-or schedule-related conflict management in construction projects, with the expectation of solving or reducing conflicts in the construction industry (Kassem et al, 2015;Scholtenhuis et al, 2016). Researchers also attempted to employ 4D CAD model to foresee the conflicts on a major railway station renovation project (Trebbe et al, 2015).…”
Section: Conflict Resolutionmentioning
confidence: 99%