2017
DOI: 10.1016/j.ijmst.2017.03.018
|View full text |Cite
|
Sign up to set email alerts
|

3D numerical parametric study of the influence of open-pit mining sequence on existing tunnels

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
7
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 20 publications
(9 citation statements)
references
References 26 publications
0
7
0
Order By: Relevance
“…However, the existing evaluation methods of surrounding rock stability are difficult to meet correctly the requirements from tunnel designing and construction due to the low precision and maneuver ability in the majority of real criterions, and it is difficult to carry out in practical tunnel engineering. In the analytical method, plastic region, tensile region, damaged region, maximum tensile stress, and displacement of tunnel surrounding rock mass are usually used as the stability index of tunnel surrounding rock mass [9][10][11], but some of indexes are difficult to obtain around tunnel during construction phase, such as plastic region, maximum tensile stress, and strain. e displacement of tunnel surrounding rock mass, which is easy relative to monitor on construction site by traditional monitoring method or last noncontact method, is selected as the index of tunnel surrounding rock stability [12][13][14].…”
Section: Introductionmentioning
confidence: 99%
“…However, the existing evaluation methods of surrounding rock stability are difficult to meet correctly the requirements from tunnel designing and construction due to the low precision and maneuver ability in the majority of real criterions, and it is difficult to carry out in practical tunnel engineering. In the analytical method, plastic region, tensile region, damaged region, maximum tensile stress, and displacement of tunnel surrounding rock mass are usually used as the stability index of tunnel surrounding rock mass [9][10][11], but some of indexes are difficult to obtain around tunnel during construction phase, such as plastic region, maximum tensile stress, and strain. e displacement of tunnel surrounding rock mass, which is easy relative to monitor on construction site by traditional monitoring method or last noncontact method, is selected as the index of tunnel surrounding rock stability [12][13][14].…”
Section: Introductionmentioning
confidence: 99%
“…The interaction between subway tunnels and surface buildings was the main technical problem encountered in the construction of early urban subway projects. A series of studies have been carried out around this topic by many scholars [1,2]. As the urban population grows rapidly, the capacity of existing subways is no longer able to meet people's travel demands.…”
Section: Introductionmentioning
confidence: 99%
“…Regarding the mutual influence of tunnels during excavation, there are several reports on the influence of tunneling on the existing tunnels in the soil rock stratum using numerical or in situ monitoring methods, even by means of theoretical tools. A parametric study is performed based on numerical methods for a three-dimensional model to explore the complex interaction of the different parameters, which may affect the tunnel response on the open-pit mining sequence of existing tunnels [6]. In another example, the deformation of an existing tunnel is analyzed by 3D finite element methods (FEM), and the settlement of the overburden is obviously influenced by the structure of the existing tunnels through the plastic development of the soil layer [7,8].…”
Section: Introductionmentioning
confidence: 99%