3D numerical investigation of the coupled interaction behavior between mechanized twin tunnels and groundwater – A case study: Shiraz metro line 2

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
3
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 26 publications
(9 citation statements)
references
References 28 publications
0
3
0
Order By: Relevance
“…D is diameter of existing shield tunnel. k is foundation bed coefficient, which is calculated by reference [16][17][18]…”
Section: Total Potential Energy Of Existingmentioning
confidence: 99%
“…D is diameter of existing shield tunnel. k is foundation bed coefficient, which is calculated by reference [16][17][18]…”
Section: Total Potential Energy Of Existingmentioning
confidence: 99%
“…Additionally, in each model, a different load is applied (20,70, and 130 kPa) 130 kPa is assumed in the densely populated area, while 70 kPa is assumed in the no populated area of Seville, and 20 kPa is recommended for locations with the low of buildings and traffic. To this end, it has been assumed that this method simpli creation of a model [53]. Two distinct methods are considered when determin weight of the buildings [29,57].…”
Section: Dimensions Of the Model And Boundary Conditionsmentioning
confidence: 99%
“…Likewise, groundwater conditions must not be overlooked as a clear influencing factor. Shivaei et al [53] studied both the drainage condition of the grout layer in mechanised excavation and the difference in surface settlement by changing the soil permeability and water table level. They concluded that with lowering the water table, the surface settlement decreased.…”
Section: Introductionmentioning
confidence: 99%
“…The real average advance rates of TBM-EPB of the lower and upper tunnels when passing the investigated section (0+980) are 4.8 and 2.99 meters per day. Assuming that it takes half a day for injected grout to reach its hardened phase (Shivaei et al, 2020), the grouting pressure was eliminated after installing two lining rings. Beyond this length, hardened grout was simulated through volume elements with elastic characteristics.…”
Section: Numerical Simulationmentioning
confidence: 99%
“…Interactions between closely spaced tunnels were studied in the literature using several approaches: physical model testing (Kim et al, 1998;Chapman et al, 2007;Ng. et al, 2013;Lu et al, 2019;Lu et al, 2019;Tran and Hiroshi, 2020), field observations (Suwansawat and Einstein, 2007;Chen et al, 2011;Ocak, 2013), empirical/analytical methods (Wang et al, 2003;Suwansawat and Einstein, 2007;Yang and Wang, 2011;Wang et al, 2018, Zhang et al, 2018Zhang et al, 2020) and numerical modeling (Ercelebi et al, 2011;Hasanpour et al, 2012;Mirhabibi and Soroush, 2013;Do et al, 2014a;Chakeri and Unver, 2014;Chakeri et al, 2014, Janin et al, 2015Sahoo and Kumar, 2018;Zhao et al, 2019;Shivaei et al, 2020;Ly et al, 2021). Most studies in the literature focused on the effect of the tunnel distance, relative position of tunnels, tunnel depth, and soil properties on the stability of tunnel lining, surrounding ground, and adjacent structures.…”
Section: Introductionmentioning
confidence: 99%