3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

Abstract: The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Se… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 10 publications
0
0
0
Order By: Relevance
“…The first category is common temporary construction (e.g., temporary buildings, temporary fences, and temporary roads), and the second is direct temporary construction (e.g., scaffolds, molds, cast iron, and footing boards). The former (common temporary construction) facilitates construction comprehensively and indirectly, whereas the latter (direct temporary construction) enables a specific construction process [15].…”
Section: Temporary Construction Work and Quality Inspection 21 Tempor...mentioning
confidence: 99%
See 1 more Smart Citation
“…The first category is common temporary construction (e.g., temporary buildings, temporary fences, and temporary roads), and the second is direct temporary construction (e.g., scaffolds, molds, cast iron, and footing boards). The former (common temporary construction) facilitates construction comprehensively and indirectly, whereas the latter (direct temporary construction) enables a specific construction process [15].…”
Section: Temporary Construction Work and Quality Inspection 21 Tempor...mentioning
confidence: 99%
“…In addition, the new unit works should be established by changing and deleting the problematic unit works to enhance the development [18]. Hence, the research breaks down the current TCW quality inspection works into unit works, as illustrated in Table 3 [15,[19][20][21][22][23]. The problematic unit works, which can occur when QM engineers conduct quality inspection works, were established through a preceding research analysis and consultations with professionals.…”
Section: Efficient Inspection Processmentioning
confidence: 99%