2017 Eighteenth International Vacuum Electronics Conference (IVEC) 2017
DOI: 10.1109/ivec.2017.8289589
|View full text |Cite
|
Sign up to set email alerts
|

20MWp High-efficiency L band multi-beam klystron for CLIC drive beam

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
1
0
Order By: Relevance
“…A commercially available 20 MW L-band klystron can supply enough RF power for the accelerator. Similar klystrons and modulators have also already been built and tested for the CLIC project (Marchesin et al, 2018), operating at 50 Hz with 150 µs pulses.…”
Section: Accelerator Designmentioning
confidence: 99%
“…A commercially available 20 MW L-band klystron can supply enough RF power for the accelerator. Similar klystrons and modulators have also already been built and tested for the CLIC project (Marchesin et al, 2018), operating at 50 Hz with 150 µs pulses.…”
Section: Accelerator Designmentioning
confidence: 99%
“…The performance surpasses the CEPC specs and promises lower power consumption and reduced production costs at the same time. An other important means to reduce the power consumption is the development of more efficient klystrons, where both CERN and IHEP are reaching efficiencies beyond 80% based on new design methods [27,28]. The power estimates for CLIC, FCCee and CEPC are based on these developments, while the power estimates for ILC still assume an efficiency of 65% based on commercially available klystrons.…”
Section: Recent Developmentsmentioning
confidence: 99%