2012
DOI: 10.5028/jatm.2012.04025611
|View full text |Cite
|
Sign up to set email alerts
|

System architecture-based design methodology for monitoring the ground-based augmentation system: Category I – Integrity risk

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In the above set of equations is not included the vertical protection level under a single-satellite (satellite i) ephemeris fault, however it is considered in the computations. Failures of the hypothesis H 1 [10] are not relevant to excluding geometries [11].…”
Section: Protection Levels Alert Limits and Position Errorsmentioning
confidence: 99%
“…In the above set of equations is not included the vertical protection level under a single-satellite (satellite i) ephemeris fault, however it is considered in the computations. Failures of the hypothesis H 1 [10] are not relevant to excluding geometries [11].…”
Section: Protection Levels Alert Limits and Position Errorsmentioning
confidence: 99%