2009
DOI: 10.5028/jatm.2009.0102201209
|View full text |Cite
|
Sign up to set email alerts
|

Reliability prediction for structures under cyclic loads and recurring inspections

Abstract: This work presents a methodology for determining the reliability of fracture control plans for structures subjected to cyclic loads. It considers the variability of the parameters involved in the problem, such as initial flaw and crack growth curve. The probability of detection (POD) curve of the field non-destructive inspection method and the condition/environment are used as important factors for structural confidence. According to classical damage tolerance analysis (DTA), inspection intervals are based on … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 2 publications
(5 reference statements)
0
1
0
Order By: Relevance
“…General information about the PoD curve for detecting throughthickness cracks by visual inspections is available in [54,55] which is summarised and applied in [56]. A Weibull distribution is assumed for the PoD in [56]:…”
Section: Detectable Crack Sizementioning
confidence: 99%
“…General information about the PoD curve for detecting throughthickness cracks by visual inspections is available in [54,55] which is summarised and applied in [56]. A Weibull distribution is assumed for the PoD in [56]:…”
Section: Detectable Crack Sizementioning
confidence: 99%