2023
DOI: 10.28927/sr.2023.004623
|View full text |Cite
|
Sign up to set email alerts
|

Mechanically stabilized wall (MSW) with geogrids as complement of partially executed anchored wall

Cristina Schmidt,
Pedro Anjos,
Ivan Steinmeyer
et al.

Abstract: This article presents the case study of Wall C11 of Lot 1 in the ringroads of Caraguatatuba and São Sebastião job site, whose original design consists of an anchored retaining wall with a concrete face supported on root piles. At the time of its interruption, only a part of the job had been executed. The alternative solution, mainly aimed at speeding up the completion of the job, was the execution of reinforced backfill with geogrids behind the concrete wall, eliminating the need for the remaining anchors. The… Show more

Help me understand this report

This publication either has no citations yet, or we are still processing them

Set email alert for when this publication receives citations?

See others like this or search for similar articles