2011
DOI: 10.1590/s0103-65132011005000068
|View full text |Cite
|
Sign up to set email alerts
|

Formulações monoestágio para o problema de programação da produção de bebidas dois estágios com sincronia

Abstract: Neste trabalho, apresentamos formulações monoestágio para o problema integrado de dimensionamento e sequenciamento de lotes de produção de bebidas dois estágios com sincronia. O problema envolve múltiplos produtos, múltiplas máquinas e tempos e custos de troca dependentes da sequência de produção. As formulações monoestágio apresentadas não têm perda de generalidade para representar o problema e, em geral, reduzem as dimensões da formulação dois estágios com sincronia apresentadas em Ferreira, Morabito e Range… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2015
2015
2015
2015

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 25 publications
(35 reference statements)
0
2
0
Order By: Relevance
“…Some production environmental arrangements in the industries are organized in different productive stages, which makes the mathematical formulations complexes (Toledo [7]), and hard to be computationally solved (Ferreira et al [2]). An important mathematical model was proposed by Drexl e Kimms [3], named Multi-level PLSP model, which "embraces multiple productive stages, considering that the production of a final item requires the production of intermediate items, which are produced in prior stages".…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Some production environmental arrangements in the industries are organized in different productive stages, which makes the mathematical formulations complexes (Toledo [7]), and hard to be computationally solved (Ferreira et al [2]). An important mathematical model was proposed by Drexl e Kimms [3], named Multi-level PLSP model, which "embraces multiple productive stages, considering that the production of a final item requires the production of intermediate items, which are produced in prior stages".…”
Section: Introductionmentioning
confidence: 99%
“…Transchel et al [8] presented a programming model with 2 stages, applied to the production process in a specific case in an industry. Ferreira et al [3], proposed single-stage mathematical formulations to a multi-stage problem in order to reduce the computational effort for the resolution. Seeanner e Meyr [6] presented a mathematical model called GLSPMS -General Lot-Sizing and Scheduling Problem for Multiple production Stages, which considers multiple stages with the possibility of having parallel production lines.…”
Section: Introductionmentioning
confidence: 99%