Automatic generation of control solution for resource allocation using Petri net model

Abstract: Geração automática da solução de controle para alocação de recursos utilizando redes de Petri RESUMO O sistema fl exível de manufatura (FMS fl exible manufacturing system) executa múltiplos processos simultaneamente que utilizam um conjunto limitado de recursos. Estes processos podem fi car permanentemente bloqueados em função da seqüência de atividades, isto é, o compartilhamento de um conjunto fi nito de recursos pode levar o sistema a um estado de autotravamento. O FMS pode ser visto como pertencente a uma … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2011
2011
2021
2021

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 10 publications
(7 citation statements)
references
References 12 publications
0
7
0
Order By: Relevance
“…Of course, since that time the deadlock theory, and especially the deadlock avoidance one, has been intensively developed -see e.g. [46,78,79,80,81,75,74,73,82,86,87] and especially [63,8,25,55,56,57,59,62,64,28,29,30,31,32,33,34,35,36,37,38,39,40,92,93,94,91,88,89,65,66,67,68,69,58,60,61,47,48,49,50,51,…”
Section: Siphons Traps Deadlocks Invariants Repetitive and Characteristic Vectorsmentioning
confidence: 99%
“…Of course, since that time the deadlock theory, and especially the deadlock avoidance one, has been intensively developed -see e.g. [46,78,79,80,81,75,74,73,82,86,87] and especially [63,8,25,55,56,57,59,62,64,28,29,30,31,32,33,34,35,36,37,38,39,40,92,93,94,91,88,89,65,66,67,68,69,58,60,61,47,48,49,50,51,…”
Section: Siphons Traps Deadlocks Invariants Repetitive and Characteristic Vectorsmentioning
confidence: 99%
“…The greatest challenge is the planning and control that guarantee of process flows and results in production established by production planning (Santos, 2000). Another important aspect is the productivity of Flexible Productive Systems it is related to the efficient use of available resources (Nakamoto et al, 2009;Asato, 2015;Kubo et al, 2016). According to Nakamoto et al (2009), the imposition of a desired dynamic behavior to the system requires, from the point of view of control a single process, the guarantee of the sequential execution of all the activities of the controlled process, being this sufficient.…”
Section: Flexible Productive Systemsmentioning
confidence: 99%
“…Another important aspect is the productivity of Flexible Productive Systems it is related to the efficient use of available resources (Nakamoto et al, 2009;Asato, 2015;Kubo et al, 2016). According to Nakamoto et al (2009), the imposition of a desired dynamic behavior to the system requires, from the point of view of control a single process, the guarantee of the sequential execution of all the activities of the controlled process, being this sufficient. But when viewed from the perspective of the overall process of the system, that is, when there are multiple processes in execution, the sequencing of process activities is lost for sharing of resources and / or process information.…”
Section: Flexible Productive Systemsmentioning
confidence: 99%
See 1 more Smart Citation
“…Once these results are available, the patient must undergo a follow-up consultation, with a service time that follows a Normal (15,5) for gynecology and Normal(10,5) for traumatology. The resources needed to carry out each consultation are an examination room and a doctor in each specialty.…”
Section: Use Casementioning
confidence: 99%