2007
DOI: 10.1590/s0101-74382007000100009
|View full text |Cite
|
Sign up to set email alerts
|

Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes

Abstract: ResumoO presente artigo apresenta, modela matematicamente e soluciona um problema multi-nível integrado de dimensionamento de lotes e programação da produção em um ambiente industrial com máquinas paralelas que apresentam restrições de capacidade, custos e tempos de preparo dependentes da seqüência. O problema é motivado pela realidade encontrada em alguns setores industriais, em particular o de fabricação e engarrafamento de bebidas. Nesse tipo de indústria a produção envolve dois níveis interdependentes com … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
18
0
14

Year Published

2012
2012
2016
2016

Publication Types

Select...
5
1
1

Relationship

2
5

Authors

Journals

citations
Cited by 19 publications
(32 citation statements)
references
References 21 publications
0
18
0
14
Order By: Relevance
“…It is also important to take into consideration the synchrony between the two main production phases: preparing syrups and packaging beverages. Some studies about non-alcoholic drink companies in Brazil, more specifically concerning the production of soft drinks and other carbonated drinks (Toledo et al, 2007;Ferreira et al, 2009) and fruit juice drinks highlight the difficulty in determining effective production plans (generally manually).…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…It is also important to take into consideration the synchrony between the two main production phases: preparing syrups and packaging beverages. Some studies about non-alcoholic drink companies in Brazil, more specifically concerning the production of soft drinks and other carbonated drinks (Toledo et al, 2007;Ferreira et al, 2009) and fruit juice drinks highlight the difficulty in determining effective production plans (generally manually).…”
Section: Introductionmentioning
confidence: 99%
“…In the fruit juice line studied in this work, the setup time, for instance, is not sequence dependent, unlike other beverage production lines. In most studies, such as in carbonated drinks, the setup operations in the production lines are widely dependent on the sequence of production (Toledo et al, 2007;Ferreira et al, 2009). In addition, in fruit juice production, tanks and filling machines must be cleaned within production time constraints.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Em algumas indústrias, um fator importante a ser considerado no planejamento da produção é a sincronia entre os dois estágios [35], [82]. Se a sincronia não é levada em conta, uma programação da produção pode ser infactível na prática.…”
Section: Processo De Produção De Bebidasunclassified
“…No presente trabalho, o problema considerado é mais simples do que os apresentados, por exemplo, em [35] e [82]. A programação da produção estudada é a de uma fábrica de refrigerantes de pequeno porte com apenas uma linha de produção e o gargalo no estágio de envase.…”
Section: Processo De Produção De Bebidasunclassified