Um modelo de análise envoltória de dados para o estabelecimento de metas de continuidade do fornecimento de energia elétrica

Abstract: ResumoEntre os aspectos da qualidade do fornecimento de energia elétrica destaca-se a continuidade, avaliada com base nos indicadores DEC e FEC que expressam, respectivamente, a duração e a freqüência das interrupções do fornecimento. Propõe-se uma nova implementação da regulação por comparação de desempenho na definição dos níveis toleráveis de DEC/FEC (metas de continuidade) para as concessionárias de distribuição e seus conjuntos de unidades consumidoras. Na abordagem proposta combinam-se dois modelos de An… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
1
0
14

Year Published

2011
2011
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(17 citation statements)
references
References 13 publications
0
1
0
14
Order By: Relevance
“…17 During the years 2000, the difficulties Light encountered in maintaining a certain quality of electricity provision in favelas were used to justify the need to categorize several favelas as separate "electricity neighborhood sets." In these areas, the number and duration of electricity interruptions tolerated by the national regulator was generally considerably higher than in all other urban areas (O Dia, 2009;Pessanha et al, 2007;Pilo', 2018). As an example, the maximum duration of supply interruptions allowed by ANEEL between 2002 and 2008 in Ricinha-Vidigal, two favelas in the southern area, were 23 hours per year.…”
Section: Totalmentioning
confidence: 86%
“…17 During the years 2000, the difficulties Light encountered in maintaining a certain quality of electricity provision in favelas were used to justify the need to categorize several favelas as separate "electricity neighborhood sets." In these areas, the number and duration of electricity interruptions tolerated by the national regulator was generally considerably higher than in all other urban areas (O Dia, 2009;Pessanha et al, 2007;Pilo', 2018). As an example, the maximum duration of supply interruptions allowed by ANEEL between 2002 and 2008 in Ricinha-Vidigal, two favelas in the southern area, were 23 hours per year.…”
Section: Totalmentioning
confidence: 86%
“…Outros trabalhos com aplicações de DEA no setor elétrico brasileiro são [22][23][24][25][26] entre outros. Já com relação ao consumo de energia elétrica tem-se [27] e à qualidade da energia elétrica [28].…”
Section: A Aplicação De Dea No Setor De Distribuição De Energia Elétunclassified
“…DEA también ha sido utilizada para definir metas de distribución de Energía Eléctrica [5], evaluar la eficiencia energética de municipios y regiones ([6] y [7]), o para evaluación de Empresas a través de una doble perspectiva [8].…”
Section: Análisis Envolvente De Datosunclassified