Differentiated Integration at the EU Member State Level 2016
DOI: 10.5771/9783845275253-23
|View full text |Cite
|
Sign up to set email alerts
|

1. Introduction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…According to Premium times, Anambra state government plan to spend 2.5 billion nairas on the Agulu lake transformation project which would make the lake a very attractive tourist center to attract both local and international tourist, with this in mind an expected increase in population and commercial activity will follow and thereby leading to increase in the quantity of wastewater produced on daily basic [11][12][13][14][15]. In the current state, the town of Agulu with a population of about 79000 (2016) still produces a lot of wastewater, and the drainage system is very bad and unreliable.…”
Section: Introductionmentioning
confidence: 99%
“…According to Premium times, Anambra state government plan to spend 2.5 billion nairas on the Agulu lake transformation project which would make the lake a very attractive tourist center to attract both local and international tourist, with this in mind an expected increase in population and commercial activity will follow and thereby leading to increase in the quantity of wastewater produced on daily basic [11][12][13][14][15]. In the current state, the town of Agulu with a population of about 79000 (2016) still produces a lot of wastewater, and the drainage system is very bad and unreliable.…”
Section: Introductionmentioning
confidence: 99%