The ITER Neutral Beam Test Facility (NBTF), called PRIMA (Padova Research on ITER Megavolt Accelerator), is hosted in Padova, Italy and includes two experiments: MITICA, the full-scale prototype of the ITER heating neutral beam injector, and SPIDER, the full-size radio frequency negative-ions source. The NBTF realization and the exploitation of SPIDER and MITICA have been recognized as necessary to make the future operation of the ITER heating neutral beam injectors efficient and reliable, fundamental to the achievement of thermonuclear-relevant plasma parameters in ITER. This paper reports on design and R&D carried out to construct PRIMA, SPIDER and MITICA, and highlights the huge progress made in just a few years, from the signature of the agreement for the NBTF realization in 2011, up to now-when the buildings and relevant infrastructures have been completed, SPIDER is entering the integrated commissioning phase and the procurements of several MITICA components are at a well advanced stage.
In the framework of the DEMOnstration fusion power plant (DEMO) design coordinated by the EUROfusion consortium, a pre-conceptual design of the superconducting magnet system has been developed. For the toroidal field coils (TFCs), three winding pack (WP) options have been proposed; exploring different winding approaches (pancakes vs. layers), and manufacturing techniques (react & wind vs. wind & react Nb 3 Sn). Thermal-hydraulic and mechanical analyses on the three WPs have produced encouraging results, with some critical issues to be solved in future studies and optimizations. The experimental tests on TF prototype short sample conductors have demonstrated a limited performance degradation with electromagnetic cycles and significantly lower effective strains than most of the large-size Nb 3 Sn conductors reported in literature. The toroidal field quench protection circuit has been studied, starting from different topologies and focusing on the most promising one. Two designs are also presented for the central solenoid magnet, with preliminary evaluations on the AC losses during the plasma breakdown. Finally, the design of a TF winding pack based on HTS conductors and the experimental tests on "fusion-relevant" HTS cables are illustrated.
The ITER project requires additional heating by two neutral beam injectors, each accelerating to 1 MV a 40 A beam of negative deuterium ions, to deliver to the plasma a power of about 17 MW for one hour. As these requirements have never been experimentally met, it was Nuclear Fusion Progress in the realization of the PRIMA neutral beam test facility
scite is a Brooklyn-based organization that helps researchers better discover and understand research articles through Smart Citations–citations that display the context of the citation and describe whether the article provides supporting or contrasting evidence. scite is used by students and researchers from around the world and is funded in part by the National Science Foundation and the National Institute on Drug Abuse of the National Institutes of Health.