2020
DOI: 10.1002/qre.2733
|Get access via publisher |Summarize |Cite
|
Sign up to set email alerts

An enhanced approach for the progressive mean control charts: A discussion and comparative analysis

Abstract: Recently, a new double progressive mean (DPM) control chart has been proposed in the literature of statistical process control. In the said proposal, an important term is missing in the variance expression of the DPM statistic that affects the detection ability of the proposed chart. In this study, we have derived and provided the correct version of the said variance along with its corresponding control limits. The run length profiles of the DPM chart are investigated, and the results are updated for the new v… Show more

Search citation statements

Order By: Relevance

Paper Sections

Select...
10
1
1
0

Citation Types

0
8
0
0

Year Published

Range
2021
2021
2025
2025

Publication Types

Select...
10
1

Relationship

1
10

Authors

Journals

citations

Cited by 11 publications

(8 citation statements)
references

References 16 publications

0
8
0
0
Order By: Relevance
How this paper cites the one you are viewing
“…Abbas et al [14] proposed the progressive mean chart, which is based on the average of all data values collected since the start-up of the system. See also [15][16][17]. The progressive mean chart seems to detect changes in the process mean when the change occurs at system start-up.…”
Section: Discussion
mentioning
confidence: 99%