1998 Winter Simulation Conference. Proceedings (Cat. No.98CH36274)
DOI: 10.1109/wsc.1998.745805
|View full text |Cite
|
Sign up to set email alerts
|

WIP evolution of a semiconductor factory after a bottleneck workcenter breakdown

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
15
0

Publication Types

Select...
3
3
1

Relationship

0
7

Authors

Journals

citations
Cited by 34 publications
(15 citation statements)
references
References 2 publications
0
15
0
Order By: Relevance
“…Define a state variable S(t) for the remaining amount of the anticipatory input. Therefore, S(0)=s, S(T)=0 and S(t) = -E(t) ... (9) In this section, a manufacturing chain of two nodes is used to describe a basic model of optimal control. Let state variable x be [WI, W2, 51T and control variable u be [ a1 , a2 ,EIIT.…”
Section: Model Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…Define a state variable S(t) for the remaining amount of the anticipatory input. Therefore, S(0)=s, S(T)=0 and S(t) = -E(t) ... (9) In this section, a manufacturing chain of two nodes is used to describe a basic model of optimal control. Let state variable x be [WI, W2, 51T and control variable u be [ a1 , a2 ,EIIT.…”
Section: Model Formulationmentioning
confidence: 99%
“…Simulation has been used to investigate the effect of some disruption events. Rose constructed a simplified plant model of simulation and investigated the behaviour of wafer fabrication when a large quantity of work-in-process suddenly emerges [9]. His plant model is made up of bottleneck workstations as well as a time delay unit that represents all other non-bottleneck stations.…”
Section: Introductionmentioning
confidence: 99%
“…The offline scheduling is also referred to as static or pre-runtime scheduling. The offline analysis of semiconductor front-end has been widely reported [14][15][16]. But, the real challenge lies in the application of online simulation [17] in complex real life applications, as the offline analysis can become very inaccurate over the longer term because of not incorporating unforeseen events such as machine failures, hot jobs, etc.…”
Section: Online Simulation In Cssmentioning
confidence: 99%
“…However, a higher WIP level will prolong cycle time and damage on-time-delivery performance. Also, WIP occupies spaces and requires material handling and control resources (Wein 1992, Askin and Krisht 1994, Rose 1998, Tu and Li 1998. Thereby, holding a proper WIP level is quite critical for backend factories to maintain performance.…”
Section: Introductionmentioning
confidence: 99%
“…Most of these methods focused on the determination of WIP level in fab production environments (Gross and Harris 1974, Wein 1992, Kuroda and Kawada 1995, Robinson et al 1990, Rose 1998, Lin and Lee 2001, Nye 2001 …”
Section: Introductionmentioning
confidence: 99%