2021
DOI: 10.2172/1822823
|View full text |Cite
|
Sign up to set email alerts
|

Wind Turbine Drivetrain Reliability and Wind Plant Operations and Maintenance Research and Development Opportunities

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(8 citation statements)
references
References 72 publications
0
8
0
Order By: Relevance
“…A Drivetrain Reliability Collaborative (DRC) was initiated by the Department of Energy (DOE) to examine why drivetrains on wind turbines are not lasting the expected design life of 20 years. In a report 11 from NREL, it was indicated that the field life of most main shaft bearings is less than 6 years. Additionally, it was indicated that the cost to replace main shaft bearings ranges from $150k to $300k.…”
Section: Fatigue Studymentioning
confidence: 99%
“…A Drivetrain Reliability Collaborative (DRC) was initiated by the Department of Energy (DOE) to examine why drivetrains on wind turbines are not lasting the expected design life of 20 years. In a report 11 from NREL, it was indicated that the field life of most main shaft bearings is less than 6 years. Additionally, it was indicated that the cost to replace main shaft bearings ranges from $150k to $300k.…”
Section: Fatigue Studymentioning
confidence: 99%
“…Recently, there has been an increasing level of industry interest in pitch bearing reliability (Shapiro 2017;Keller et al 2021). Some populations demonstrate a 12% failure rate in 20 years (Hornemann 2019).…”
Section: Pitch Bearing Reliabilitymentioning
confidence: 99%
“…And roughly half of this is due to WT operations and maintenance (O&M) 16,17 . The potential LCOE cost reduction by addressing O&M costs is estimated to be up to 40% for offshore WTs 18 . According to Dao et al, 19 the gearbox does not fail often; however, it causes the highest downtime, along with blades and hub, in both onshore and offshore WTs.…”
Section: Introductionmentioning
confidence: 99%