Visilean® application for monitoring and control of pre-fabricated concrete panels

Abstract: Good design and construction planning are essential to ensure the quality of the final product. To do this, it is necessary to develop an integrated organizational system for production and work schedule control, just in time material delivery, job site layout planning and real-time task management. The main objective of this work is to propose a method to improve process flow planning of prefabricated concrete panels based on the software application that uses Visilean® to monitor the movement of the parts in… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
4
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(4 citation statements)
references
References 10 publications
0
4
0
Order By: Relevance
“…To do so, the proposed framework tries to cover deliverables from the planning and control tool (LPS), application of JIT and pull signals, and development of IoT architecture to continuously track, monitor, and localize prefabricated components. The proposed framework was based on studying different cases in offsite and onsite construction (Chen et al, 2020;Dave et al, 2016;Kanai et al, 2021;Li et al, 2018;Von Heyl & Teizer, 2017;Xu et al, 2018) and based on studying a process map in a prefabrication company in Canada.…”
Section: The Proposed Frameworkmentioning
confidence: 99%
See 3 more Smart Citations
“…To do so, the proposed framework tries to cover deliverables from the planning and control tool (LPS), application of JIT and pull signals, and development of IoT architecture to continuously track, monitor, and localize prefabricated components. The proposed framework was based on studying different cases in offsite and onsite construction (Chen et al, 2020;Dave et al, 2016;Kanai et al, 2021;Li et al, 2018;Von Heyl & Teizer, 2017;Xu et al, 2018) and based on studying a process map in a prefabrication company in Canada.…”
Section: The Proposed Frameworkmentioning
confidence: 99%
“…This synchronization has to cover all flow phases starting from the arrival of the raw materials at the factory and ending with the onsite assembly. Failure to achieve such synchronization can prohibit the delivery of materials or components and cause an increase in time and cost of the project (Kanai et al, 2021). The heavy dependence on the critical path method (CPM), delivery of materials based on pushing strategies, and lack of focus on optimizing the overall production system in the factory and site are among the most affecting factors that limit the flow synchronization (Mossman & Sarhan, 2021).…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations