Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study

Abstract: Study Sponsors and Key PlayersThe CAISO/PLEXOS 33% Renewable Portfolio Standard (RPS) study was initiated by the California Public Utilities commission (CPUC) in late 2008. The CPUC tasked the California Independent Systems Operator (CAISO) to manage and perform the study. In turn, CAISO partnered with a team at PLEXOS Solutions (a software vendor) to build the model, and tasked analysts at Southern California Edison (SCE) to run the model. The SCE analysts also worked directly with PLEXOS Solutions to refine … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
5
0

Year Published

2012
2012
2016
2016

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(5 citation statements)
references
References 0 publications
0
5
0
Order By: Relevance
“…In reality, these investment decisions would also be based on stochastic distributions of PIs, which can lead to different, suboptimal capacity mixes, also because investors in the power sector are risk-averse (Fan et al, 2010). An integrated stochastic optimization, simulation and business case analysis tool like this requires a supercomputer to solve, however (Meyers et al, 2011). 7.…”
Section: Limitations Of the Analysismentioning
confidence: 99%
“…In reality, these investment decisions would also be based on stochastic distributions of PIs, which can lead to different, suboptimal capacity mixes, also because investors in the power sector are risk-averse (Fan et al, 2010). An integrated stochastic optimization, simulation and business case analysis tool like this requires a supercomputer to solve, however (Meyers et al, 2011). 7.…”
Section: Limitations Of the Analysismentioning
confidence: 99%
“…Mid-project, the CPUC contacted LLNL to investigate using supercomputers to accelerate the exection of the ensemble of simulations required for the study. LLNL partnered with Energy Exemplar, makers of PLEXOS for Power Systems R , to accelerate the solution by running the large computational simulations on LLNL's Hyperion supercomputer and by modifying the problem formulation [9].…”
Section: Supercomputers For Grid Planningmentioning
confidence: 99%
“…It incorporates resource data, hourly load data for wind, import, hydro, solar, geothermal, and qualifying facility generation. The model covers 12 regions total across the WECC grid (shown in Figure 3), and it includes 42 utilities, 2157 generators, and 104 transmission lines [9]. The basic form of the model is an ensemble of deterministic unit commitment models.…”
Section: Supercomputers For Grid Planningmentioning
confidence: 99%
See 1 more Smart Citation
“…Traditionally, a single deterministic solution is given based on a PCM simulation horizon. Some studies simulate a suite of scenarios highlighting the system sensitivity to certain input variables (e.g., wind or solar generation profiles) where each simulation is computed simultaneously (Meyers et al 2011). …”
Section: Introductionmentioning