2012
DOI: 10.1007/978-81-322-1038-2_35
|View full text |Cite
|
Sign up to set email alerts
|

Using Firefly Algorithm to Solve Resource Constrained Project Scheduling Problem

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
10
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
4
3

Relationship

1
6

Authors

Journals

citations
Cited by 14 publications
(10 citation statements)
references
References 28 publications
0
10
0
Order By: Relevance
“…It is inspired by the flashing lights of fireflies in nature. Previous studies show that the FA can perform superiorly, compared with genetic algorithm and particle swarm optimization [2,3], and it is applicable for mixed variable and engineering optimization [4][5][6][7][8][9][10]. In [11], it presented FA to minimize the real power losses and to improve the voltage profile.…”
Section: Introductionmentioning
confidence: 97%
“…It is inspired by the flashing lights of fireflies in nature. Previous studies show that the FA can perform superiorly, compared with genetic algorithm and particle swarm optimization [2,3], and it is applicable for mixed variable and engineering optimization [4][5][6][7][8][9][10]. In [11], it presented FA to minimize the real power losses and to improve the voltage profile.…”
Section: Introductionmentioning
confidence: 97%
“…In short, 5 years since it is presented, FA has been successfully applied in many areas, such as vector quantization in image compression [41], traveling salesman problem [42], path planning [43,44], PID controller tuning [45], nonlinear optimization problem [46], job shop, Flowshop and project scheduling problems [47][48][49], data clustering [50] and so on. These research demonstrates the high efficiency of FA to solve the NP-hard and combinatorial optimization problem.…”
Section: Introductionmentioning
confidence: 99%
“…A comprehensive study on different types of RCPSP has been presented by Yang et al (2001). In single mode RCPSP, a project consisting of a set of activities with fixed durations and resource requirements is considered (Zeighami et al, 2013). In multi-mode RCPSP, each activity can be executed under different durations with renewable and non-renewable resources (Coelho & Vanhoucke, 2011).…”
Section: Introductionmentioning
confidence: 99%
“…Ant colony optimization (Merkle et al, 2002) is another swarm-based optimization algorithm used to solve RCPSP. Firefly algorithm is known as another meta-heuristic methods which has been used by Sanaei et al (2013) for scheduling problems. Generally, different types of meta-heuristics have been used to solve this type of RCPSP.…”
Section: Introductionmentioning
confidence: 99%