2020
DOI: 10.1016/j.buildenv.2020.106904
|View full text |Cite
|
Sign up to set email alerts
|

Uncertainty of building elements’ service lives in building LCA & LCC: What matters?

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
23
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 70 publications
(38 citation statements)
references
References 29 publications
0
23
0
1
Order By: Relevance
“…Studies over longer RSPs have a longer operational phase and therefore higher impacts for both operational energy use and maintenance/ replacement. Goulouti et al (2020) show that the choice of RSP influences what building elements contribute most to uncertainty on the results. Vilches et al (2017) review LCA of refurbishment operations and point out that RSPs varied from 50 to 150 years.…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Studies over longer RSPs have a longer operational phase and therefore higher impacts for both operational energy use and maintenance/ replacement. Goulouti et al (2020) show that the choice of RSP influences what building elements contribute most to uncertainty on the results. Vilches et al (2017) review LCA of refurbishment operations and point out that RSPs varied from 50 to 150 years.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Frischknecht et al (2020) showed that significant discrepancies exist between assessments using methods from different countries, even when they assess the same building. A recent statistical study by Goulouti et al (2020) found that maintenance and replacement processes account for 14-36% of life cycle GWP at the building level. Studies focusing on embodied emissions show that, in some cases, maintenance and replacement processes can account for about half of life cycle embodied emissions (Häfliger et al 2017;Petrovic et al 2019).…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…In other words, no durability period has been established or SLP has been performed. Indeed, databases that include the RSLV for building elements, generally cover interior elements like floors, walls and finishes, roof coverings, exterior insulation, doors, windows and structural elements [185][186][187][188], but not the out-of-sight BEMs. Yet, standard CAN/CSA S478-19 requires BEMs to last as long as the design life of the building itself because BEMs are concealed and not readily accessible for repairs [23], which may be prohibitively expensive if carried out.…”
Section: Knowledge Gapsmentioning
confidence: 99%
“…Multiple studies analyse the uncertainty of LCA and the methods to be taken into account to assess it [26][27][28]. For instance, the Gouloutis study [26] mentions various methods have been proposed to quantify these uncertainties and their impact on the LCA output: scenario analysis, quantitative uncertainty analysis, and sensitivity analysis. It is also commented that different studies have shown that the service life calculation is governed by high uncertainty.…”
Section: Introductionmentioning
confidence: 99%