2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER) 2012
DOI: 10.1109/chuser.2012.6504280
|View full text |Cite
|
Sign up to set email alerts
|

Time and cost performance of costruction projects in southern and cenrtal regions of penisular Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
25
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
8
1
1

Relationship

1
9

Authors

Journals

citations
Cited by 33 publications
(26 citation statements)
references
References 8 publications
1
25
0
Order By: Relevance
“…This is evidenced in a study conductedby Shehuet al [19] has unveiled that a considerable number of sampled building projects suffered from budget overrun. The studiesby several other researchers [20][21][22] also confirmed that Malaysian construction projects have been affected by budget overrun. Many studies have been carried out on the issue of budget overrun, however, most of the studies focused only on the causative factors of budget overrun, while less attention has been given to its remedies.…”
Section: Introductionmentioning
confidence: 56%
“…This is evidenced in a study conductedby Shehuet al [19] has unveiled that a considerable number of sampled building projects suffered from budget overrun. The studiesby several other researchers [20][21][22] also confirmed that Malaysian construction projects have been affected by budget overrun. Many studies have been carried out on the issue of budget overrun, however, most of the studies focused only on the causative factors of budget overrun, while less attention has been given to its remedies.…”
Section: Introductionmentioning
confidence: 56%
“…In Nigeria, the most frequent causes of delays and were found to be improper planning, lack of proper communication, and shortage of supply (Kasimu, 2012). In Malaysia, the research has been found that cost overruns and time overruns are major issues with respondence of 89% and 92% of agreement respondent rate (Rahman, Memon, Nagapan, Latif, & Azis, 2013). In Egypt, the top ten delay causes according to their frequencies were found to be the type of project bidding and award (negotiation, lowest bidder), ineffective planning and scheduling of the project, variation of orders/change of scope by project owner during construction, late in receiving and approving design documents by the owner, finance, and payments of completed work by owner, poor site management and supervision, the low productivity level of labors, difficulties in financing the project by contractors, effects of subsurface conditions (like soil, high water table, etc), and slow decision making (Marzouk & El-Rasas, 2014).…”
Section: Causes Of Time and Cost Overrunsmentioning
confidence: 99%
“…The issue of successful management of construction projects and key performance indicators (KPIs) in construction is discussed by more studies, which agree on the importance of this issue [1], [2], [3]. A study of authors from Slovakia addressed the issue of lost profits in construction [4].…”
Section: Introductionmentioning
confidence: 99%