2015
DOI: 10.1109/mpe.2015.2431216
|View full text |Cite
|
Sign up to set email alerts
|

The View from the Wide Side: Wide-Area Monitoring Systems in India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(4 citation statements)
references
References 0 publications
0
4
0
Order By: Relevance
“…All the regional grids were operating individually until the 1990s, but with the time changes, the interconnection between the grids was formed to make a central grid operating at a single frequency. In December 2013, one of the remaining (southern) grids was connected to the central grid (formed by the interconnection of the remaining four regional grids) by deploying the synchrophasor measurements devices in the overall system to form one nation, one grid, and one frequency [10]. The pilot project initiative was extended to install the PMU devices in all the specified regions to get real-time observation of the interconnected grid [11].…”
Section: Backgroundsmentioning
confidence: 99%
See 1 more Smart Citation
“…All the regional grids were operating individually until the 1990s, but with the time changes, the interconnection between the grids was formed to make a central grid operating at a single frequency. In December 2013, one of the remaining (southern) grids was connected to the central grid (formed by the interconnection of the remaining four regional grids) by deploying the synchrophasor measurements devices in the overall system to form one nation, one grid, and one frequency [10]. The pilot project initiative was extended to install the PMU devices in all the specified regions to get real-time observation of the interconnected grid [11].…”
Section: Backgroundsmentioning
confidence: 99%
“…The result is that the entity is zero if there is no interconnection of tie-line between a bus from area-1 and another bus from area-2; otherwise, entities will be one. The reliability constraints are formulated as shown in equation (7)(8)(9)(10). The power flow constraints result in the optimum solution for load interruption during load flow analysis [30].…”
Section: A C C E P T E Dmentioning
confidence: 99%
“…The effective deployment of micro Phasor Measurement Units (μ-PMU) [1] for real-time wide area monitoring and control of large and renewable rich complex power system thus enhancing system operational efficiency is being explored by utilities worldwide. For PMU deployment in Indian power system, a hierarchical architecture is established for routing and updating GPS time synchronized information at the respective Load Dispatch Centre, via high-speed wide-band communication network at rates up to 60 cycles per second [2,3]. Dynamic response of the system is revealed by the high-resolution time synchronized PMU data.…”
Section: μ-Pmu For Smart Distribution Systemmentioning
confidence: 99%
“…Due to the historical occurrence of several blackouts [1][2][3], significant research efforts have been motivated to investigate their causes to prevent future events [4][5][6]. That research suggests that monitoring systems have to be improved [7]. An essential factor to achieve this goal is the wide-area measurement system (WAMS), and, more specifically, the use of phasor measurement units (PMUs).…”
Section: Introductionmentioning
confidence: 99%