All Days 2001
DOI: 10.2118/68190-ms
|View full text |Cite
|
Sign up to set email alerts
|

The Feasibility of Using Time-Lapse 3D Seismic to Monitor Fluid Displacements in an Abu Dhabi Onshore Oil Field

Abstract: TX 75083-3836, U.S.A., fax 01-972-952-9435.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2010
2010

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Prior to the 4D pilot, an extensive feasibility study was performed with the aid of ADCO shareholder experts (Kleiss et al, 2000). Rock-physics modeling predicted changes in velocity and density that would be caused by saturation changes resulting from water having replaced oil in the reservoir.…”
Section: Introductionmentioning
confidence: 99%
“…Prior to the 4D pilot, an extensive feasibility study was performed with the aid of ADCO shareholder experts (Kleiss et al, 2000). Rock-physics modeling predicted changes in velocity and density that would be caused by saturation changes resulting from water having replaced oil in the reservoir.…”
Section: Introductionmentioning
confidence: 99%