2008
DOI: 10.1016/j.enpol.2008.06.013
|View full text |Cite
|
Sign up to set email alerts
|

The costs and impacts of intermittency: An ongoing debate

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

3
58
1
1

Year Published

2011
2011
2018
2018

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 62 publications
(63 citation statements)
references
References 6 publications
3
58
1
1
Order By: Relevance
“…The occurrence of "low-wind coldsnaps" (3) has been the subject of some debate in the literature, with sometimes apparently conflicting results (c.f. 4; 5).…”
Section: Introductionmentioning
confidence: 99%
“…The occurrence of "low-wind coldsnaps" (3) has been the subject of some debate in the literature, with sometimes apparently conflicting results (c.f. 4; 5).…”
Section: Introductionmentioning
confidence: 99%
“…This is a necessary first step in the transition to a clean energy future [13,14], but leads to many open questions on how to manage a highlyrenewable power system [15]. Fig.…”
Section: Introductionmentioning
confidence: 99%
“…Primary and secondary reserve in this work are provided by online units (thermal, hydro, EVs), whereas tertiary control can be provided from both online and offline quick-start (CCGT, OCGT) units. Primary control reserve, both up and down, are at constant values of 1.9 GW as they corresponds to the reserve for frequency response in UK power system [38]. Secondary and tertiary control are time vectors of constant values.…”
Section: Power System and Electrical Demandmentioning
confidence: 99%
“…Electric demand for UK power system, which is a typical low flexible power system relaying on thermal power plants, is displayed in Fig. 1 for typical high (60 GW -winter peak) and low-demand week (50 GW) [38]. Additional data about UK power system used can be found in [39].…”
Section: Power System and Electrical Demandmentioning
confidence: 99%