2018
DOI: 10.1016/j.sysarc.2018.08.007
|View full text |Cite
|
Sign up to set email alerts
|

Task scheduling with fault-tolerance in real-time heterogeneous systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
22
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 30 publications
(22 citation statements)
references
References 19 publications
0
22
0
Order By: Relevance
“…In the PB model, two copies of a task, namely, the primary copy and the backup copy, are allocated to the two different nodes. There is also an acceptance test in the model, which is adopted to check the correctness of allocations [12].…”
Section: Related Workmentioning
confidence: 99%
See 4 more Smart Citations
“…In the PB model, two copies of a task, namely, the primary copy and the backup copy, are allocated to the two different nodes. There is also an acceptance test in the model, which is adopted to check the correctness of allocations [12].…”
Section: Related Workmentioning
confidence: 99%
“…The backup copy of a task can have two alternative schemes, one is the passive backup-copy scheme [12], the other is the active backup-copy scheme [28]. For the passive backup-copy scheme, the real-time tasks should have enough laxity to restart their backup copies [29], and the backup copy of a task is allowed to execute only when a fault occurs in the primary task [30], [31].…”
Section: Related Workmentioning
confidence: 99%
See 3 more Smart Citations