2001
DOI: 10.1115/2001-gt-0102
View full text
|
|
Share

Abstract: The paper deals with the set-up and preliminary test-planning of an innovative mini cogeneration plant, in which exhaust gases coming from a 45 kWe rated turbogenerator directly feed an absorption chiller / heater with a 170 kWth chilling and a 160 kWth heating capability. Electric power is partly used on site to satisfy the plant auxiliary systems power demands and partly vectorised to the main building of the Engineering Faculty (15 km from the plant site) through the main electric grid. Thermal power is exp…

expand abstract