2008
DOI: 10.1016/j.ijpe.2008.07.010
|View full text |Cite
|
Sign up to set email alerts
|

Solving a multi-period supply chain problem for a pulp company using heuristics—An application to Södra Cell AB

Abstract: In this paper, the integrated planning of production and distribution for a pulp company is considered. The tactical decisions included regard transportation of raw materials from harvest areas to pulp mills; production mix and contents at pulp mills; inventory; distribution of pulp products from mills to customers and the selection of potential orders and their levels at customers. The planning period is one year and several time periods are included. As a solution approach we make use of two different heuris… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
30
0

Year Published

2009
2009
2023
2023

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 35 publications
(30 citation statements)
references
References 20 publications
0
30
0
Order By: Relevance
“…One way to track down the needed and also optimal feedstock at terminal or plant will be to extend the objective function by a time factor. This can be done in such a way that demand and resource availability on a monthly basis are incorporated into the model (Eriksson andBjörheden 1989, Gunnarsson andRönnqvist 2008).…”
Section: Discussionmentioning
confidence: 99%
“…One way to track down the needed and also optimal feedstock at terminal or plant will be to extend the objective function by a time factor. This can be done in such a way that demand and resource availability on a monthly basis are incorporated into the model (Eriksson andBjörheden 1989, Gunnarsson andRönnqvist 2008).…”
Section: Discussionmentioning
confidence: 99%
“…As such, a real problem situation for the case company has been conceptualized and modelled into a scientific mathematical model, in line with Mitroff et al (1974). This model is partly based on a previous model developed by Gunnarsson et al (2007) and modified by Gunnarsson and Rönnqvist (2008). In this dissertation the previous model is referred to as the Mill Mission model, which in a modified form is currently in use at the case company for supply chain planning purposes.…”
Section: Studymentioning
confidence: 99%
“…This study had a starting point in the Mill Mission model previously developed by Helene Lidestam (see e.g. Gunnarsson et al, 2007;Gunnarsson and Rönnqvist, 2008). Thus, Helene Lidestam has partly been involved in the modelling phase as well as in the writing process of Paper 2 and Paper 3.…”
Section: Author's Statementmentioning
confidence: 99%
See 2 more Smart Citations