2016
DOI: 10.15676/ijeei.2016.8.2.8
|View full text |Cite
|
Sign up to set email alerts
|

Solution of Economic Load Dispatch problem in Power System using Lambda Iteration and Back Propagation Neural Network Methods

Abstract: Economic load dispatch is the process of allocating the required load demand between the available generators in power system while satisfying all units and system equality and inequality constraints. Economic Load Dispatch solutions are found by solving the conventional methods such as lambda iteration, Gradient search method, Linear Programming and Dynamic Programming while at the same minimizing fuel costs, but convergence is too slow, so in order to get fast convergence and accurate results we are using ar… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0
2

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 18 publications
(8 citation statements)
references
References 12 publications
0
5
0
2
Order By: Relevance
“…The architecture of MNN is as given in Figure 3 [14,15]. It has an input, hidden and output layers with n,p and m number of neurons.…”
Section: Back Propagation Algorithmmentioning
confidence: 99%
“…The architecture of MNN is as given in Figure 3 [14,15]. It has an input, hidden and output layers with n,p and m number of neurons.…”
Section: Back Propagation Algorithmmentioning
confidence: 99%
“…At present, this is the superlative neural network learning algorithm and the majority of neural network presentations are grounded on this algorithm [8]. In a BP network, the transfer function for neurons is frequently a differentiable function with the sigmoid.…”
Section: B Backpropagation Neural Networkmentioning
confidence: 99%
“…They reduced the manual effort by separating the least possible loads from the neural network. A Hydro-thermal scheduling based on ANN was proposed by Suman, et al [9]. In this scheduling method, the total load is shared between hydro and thermal power stations according to the cost of power generation.…”
Section: Introductionmentioning
confidence: 99%