1990
SESFAC: A Scheduling Expert System for Flexible Assembly Cell
Search citation statements
Paper Sections
Select...
11
1
0
0
Citation Types
0
1
0
0
Year Published
Range
1990
2017
Publication Types
Select...
6
3
3
Relationship
0
12
Authors
Journals
Cited by 12 publications
(1 citation statement)
References 19 publications
0
1
0
0
Application of Fuzzy Logic to Multi-Objective Scheduling Problems in Robotic Flexible Assembly Cells
Abstract
Smart CitationsHow this paper cites the one you are viewing
“…The studies in the second category investigated simulation as an approach to scheduling RFACs, for instance, Gilbert et al [14], Hsu and Fu [15] and Barral et al [16]. There are only two studies in the third category, by Brussel et al [17] and Dell Valle and Camacho [18], which implemented expert systems approaches to solve scheduling problems. The major limitation of the above studies is that they concentrated on assembly of only one type of product at a time.…”
Section: Introduction
mentioning
confidence: 99%