Risk Response of Complex Projects: Risk Association Network Method

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
32
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
10

Relationship

1
9

Authors

Journals

citations
Cited by 43 publications
(32 citation statements)
references
References 78 publications
0
32
0
Order By: Relevance
“…2.4 Social distancing, job re-organization and schedule performance relationships On construction project sites, the adoption of virtual or remote working is not practicable. Therefore, for construction workers to report to the project site, social distancing measures need to be adopted through job re-organization to reduce or limit person-to-person contacts (Gravina et al, 2020;Yang et al, 2021). Hence, during work times, employers are encouraged to limit the level of interaction among employees during the day's work (Gravina et al, 2020).…”
Section: Job Re-organization and Schedule Performancementioning
confidence: 99%
“…2.4 Social distancing, job re-organization and schedule performance relationships On construction project sites, the adoption of virtual or remote working is not practicable. Therefore, for construction workers to report to the project site, social distancing measures need to be adopted through job re-organization to reduce or limit person-to-person contacts (Gravina et al, 2020;Yang et al, 2021). Hence, during work times, employers are encouraged to limit the level of interaction among employees during the day's work (Gravina et al, 2020).…”
Section: Job Re-organization and Schedule Performancementioning
confidence: 99%
“…To find signal organizations, it is critical to evaluate the importance of nodes from the network's perspective. Node importance is generally assessed by two parameters: (1) node degree [66,67]; and (2) node centrality, including degree centrality, closeness centrality, betweenness centrality, and eigenvector centrality [68]. Nevertheless, conflicting results frequently occur because node importance usually ranks differently between the analysis of the five parameters.…”
Section: Meetingsmentioning
confidence: 99%
“…Given the increasing complexity and expertise of construction projects, GCs hire more SubCs for every work type, considering that SubCs play a critical role in construction projects [13,28]. The GC shares not only the profit with the SubCs but also the risks [13,15]. Therefore, SubCs hired by the GC can account for up to approximately 90% of the total project value [11,29].…”
Section: Microscopic Viewpoint Analysis Of the Resource Planningmentioning
confidence: 99%