2018
DOI: 10.1049/iet-gtd.2018.6278
|View full text |Cite
|
Sign up to set email alerts
|

Risk assessment‐based long‐term transmission system hardening under prior probabilistic information

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(1 citation statement)
references
References 29 publications
0
1
0
Order By: Relevance
“…A contingency screening model, which incorporates the probability and load loss, was proposed to identify the high-risk events in [21]. The bilevel programming for contingency screening was also adopted in the transmission expansion planning [10,22] and the unit commitment [23] to quantify the reliability risk of candidate schemes.…”
Section: Introductionmentioning
confidence: 99%
“…A contingency screening model, which incorporates the probability and load loss, was proposed to identify the high-risk events in [21]. The bilevel programming for contingency screening was also adopted in the transmission expansion planning [10,22] and the unit commitment [23] to quantify the reliability risk of candidate schemes.…”
Section: Introductionmentioning
confidence: 99%