2017
DOI: 10.4172/2167-7921.1000251
|View full text |Cite
|
Sign up to set email alerts
|

Reverse Evaluation of Failure Mode and Effects Analysis Model: A New Reliable Performance Measurement

Abstract: After the World War II (WWII), the industrial era began. Therefore the risk management philosophy concerns shifted from error resolving to error prevention by predicting the causes. One of the most common processes used to decrease the failures is utilizing the Failure Mode and Effects Analysis (FMEA). FMEA approximates the probability based on Risk Priority Number (RPN). RPN is known for limitations in the process of RPN scoring system measuring the severity (S), occurrence (O), and detection of the failure (… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 17 publications
0
1
0
Order By: Relevance
“…The FMEA method applies inferential statistics and mathematics in determining the potential risk of process failure. Risk Priority Number (RPN) is the basis for estimating probability assessments on the FMEA method [18], [19]. In this study, the identification of potential risks is based on the process of material flow that occurs in electronic waste management.…”
Section: Introductionmentioning
confidence: 99%
“…The FMEA method applies inferential statistics and mathematics in determining the potential risk of process failure. Risk Priority Number (RPN) is the basis for estimating probability assessments on the FMEA method [18], [19]. In this study, the identification of potential risks is based on the process of material flow that occurs in electronic waste management.…”
Section: Introductionmentioning
confidence: 99%