2014
DOI: 10.1109/tste.2013.2289864
|View full text |Cite
|
Sign up to set email alerts
|

Real-Time Implementation of Intelligent Reconfiguration Algorithm for Microgrid

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
44
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 88 publications
(44 citation statements)
references
References 25 publications
0
44
0
Order By: Relevance
“…The load shedding planning and implementation procedures repeat at each interval. To show the functionality and feasibility of our algorithm, we configured the system with one , five s, and seven s. The modified CERTS MG consists of five generators, seven loads, and 23 breakers [27]. A graphical representation of normal operation of the modified CERTS is shown in Figure 2.…”
Section: Performance Evaluationmentioning
confidence: 99%
“…The load shedding planning and implementation procedures repeat at each interval. To show the functionality and feasibility of our algorithm, we configured the system with one , five s, and seven s. The modified CERTS MG consists of five generators, seven loads, and 23 breakers [27]. A graphical representation of normal operation of the modified CERTS is shown in Figure 2.…”
Section: Performance Evaluationmentioning
confidence: 99%
“…Different approaches of genetic algorithm have been used for power distribution reconfiguration [18][19][20]. The genetic algorithm developed for this application can be summarized in the following steps:…”
Section: Genetic Algorithmsmentioning
confidence: 99%
“…Hence this algorithm will be superior to other algorithms, which will directly go for reconfiguration and The novel algorithm proposed in this paper overcomes one of the major disadvantages of the existing algorithms for load shedding and reconfiguration of microgrid based on load priority [2]. These algorithms will not be able to generate solutions for all load-magnitude/ load-priority combinations unless suitable load-magnitude, load-priority product values are calculated and used.…”
Section: Load Shedding and Reconfiguration Algorithmmentioning
confidence: 99%
“…In [2] real time implementation of the reconfiguration of SPS and modified CERTS microgrid using genetic algorithm is described. In [3] binary PSO is used for the restoration of SPS.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation