2015
DOI: 10.1109/jsyst.2014.2325967
|View full text |Cite
|
Sign up to set email alerts
|

Real-Time Economic Dispatch Considering Renewable Power Generation Variability and Uncertainty Over Scheduling Period

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
55
0
3

Year Published

2017
2017
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 206 publications
(58 citation statements)
references
References 25 publications
0
55
0
3
Order By: Relevance
“…The OPF is performed only at the beginning of each scheduling interval, while also satisfying all the constraints of the subintervals by incorporating the generating costs of the subintervals. The operation strategies obtained in this way are named 'best-fit' participation factors [209,210]. They are then utilized to correct the decision variables of subintervals based on forecasted values of REG and demand.…”
Section: Opf-based Rt-emssmentioning
confidence: 99%
“…The OPF is performed only at the beginning of each scheduling interval, while also satisfying all the constraints of the subintervals by incorporating the generating costs of the subintervals. The operation strategies obtained in this way are named 'best-fit' participation factors [209,210]. They are then utilized to correct the decision variables of subintervals based on forecasted values of REG and demand.…”
Section: Opf-based Rt-emssmentioning
confidence: 99%
“…Wind power is one of the fastest-growing sources, however it is uncertain and cannot be scheduled due to its intrinsic dependence on varying weather conditions over many years [2,3]. Solar power is less uncertain, but has higher variability compared to wind power [4]. Unlike wind energy, hydropower can be scheduled and has already played an important role in electricity supply all over the world.…”
Section: Introductionmentioning
confidence: 99%
“…La principal desventaja de este tipo de energía es la aleatoriedad de la velocidad del viento y la radiación solar que hace que no sea certero programar con antelación un despacho económico. Es entonces necesario utilizar algoritmos rápidos que programen un despacho económico óptimo cuando hay una alta incertidumbre de las inyecciones de energía por parte de los paneles solares y los aerogeneradores eólicos, y así se permitan simular una alta cantidad de posibles escenarios [1], [2].…”
Section: Introductionunclassified
“…De esta manera el problema corresponde a una optimización de una función objetivo y unas restricciones que se deben cumplir, para los diferentes escenarios aleatorios de las potencias inyectadas renovables [1], [2], [3], [4]. En el presente escrito se propone el uso de la función f mincon de M atlab para realizar el despacho económico de un sistema de potencia con penetración de energías renovables.…”
Section: Introductionunclassified
See 1 more Smart Citation