Proposed Method for the Design of Geosynthetic-Reinforced Pile-Supported (GRPS) Embankments

Abstract: Soft soils with unfavorable properties can be improved using various ground-improvement methods. Among these methods, geosynthetic-reinforced pile-supported (GRPS) embankments are considered a reliable option for challenging ground conditions and time-bound projects. Nevertheless, the intricate load transfer mechanism of the GRPS embankment presents challenges due to the multiple interactions among its components. To overcome the limitations of current design methods that do not fully account for all interacti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(5 citation statements)
references
References 31 publications
0
2
0
Order By: Relevance
“…The Fig. 16 shows the comparison analysis of load efficiency of the proposed analysis with existing methods such as EBEGO, BS 8006, and CUR 226 [33]. The load efficiency of the proposed system is higher than existing systems.…”
Section: Simulation Of the Proposed Systemmentioning
confidence: 95%
“…The Fig. 16 shows the comparison analysis of load efficiency of the proposed analysis with existing methods such as EBEGO, BS 8006, and CUR 226 [33]. The load efficiency of the proposed system is higher than existing systems.…”
Section: Simulation Of the Proposed Systemmentioning
confidence: 95%
“…According to the "Code for Design of Railway Tunnels", the model length was 180.0 m along the Y direction, 82.23 m along the X direction, and 100 m along the Z direction, and the overburden value was 11~23 m. The model was fixed in both vertical and horizontal directions at the bottom, which prevented excessive displacement during the simulation. Furthermore, vertical boundaries were constrained along a horizontal direction to prevent any potential distortion of the results [37]. The mesh size of the tunnel and initial support structure was 1.0 m, and that of the surrounding rock was 4.0 m. Hence, the mesh number was 164,335, and the node number was 904,520.…”
Section: Model and Parametersmentioning
confidence: 99%
“…With the advancement of computer technology and the increase of processing speeds for complex calculations, numerical modeling has become a more accessible and efficient means for calibrating models for use in complicated geotechnical problems [12]. By leveraging the advantages of the finite element method, this study aimed to analyze the behavior of a GRPS embankment and overcome the challenges associated with cost and implementation.…”
Section: Model Simulationmentioning
confidence: 99%
“…Buildings 2023, 13, x FOR PEER REVIEW 8 of 20 means for calibrating models for use in complicated geotechnical problems [12]. By leveraging the advantages of the finite element method, this study aimed to analyze the behavior of a GRPS embankment and overcome the challenges associated with cost and implementation.…”
Section: Model Simulationmentioning
confidence: 99%
See 1 more Smart Citation