2012
DOI: 10.1049/iet-gtd.2010.0666
|View full text |Cite
|
Sign up to set email alerts
|

Primary power distribution systems planning taking into account reliability, operation and expansion costs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
52
0
4

Year Published

2013
2013
2021
2021

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 65 publications
(56 citation statements)
references
References 20 publications
0
52
0
4
Order By: Relevance
“…Planning components associated to each PT in reviewed work are designated with symbols A, B, C, and D, respectively, also shown in an overarching diagram as in Figure 1. The color coding allocated to each PT in the arrangement order includes green (A) for DGP ; orange (B) for VPQ [53][54][55][56][57][58][59][60][61][62][63][64][65][66][67][68][69][70]; blue (C) for CRU [71][72][73][74][75][76][77][78][79][80][81][82][83][84][85][86][87][88][89] and purple (D) for NTR [90][91][92][93][94][95][96][97][98][99][100]. It is important to note that date o...…”
Section: Composite Review Of Mop Techniques With Taxonomymentioning
confidence: 99%
“…Planning components associated to each PT in reviewed work are designated with symbols A, B, C, and D, respectively, also shown in an overarching diagram as in Figure 1. The color coding allocated to each PT in the arrangement order includes green (A) for DGP ; orange (B) for VPQ [53][54][55][56][57][58][59][60][61][62][63][64][65][66][67][68][69][70]; blue (C) for CRU [71][72][73][74][75][76][77][78][79][80][81][82][83][84][85][86][87][88][89] and purple (D) for NTR [90][91][92][93][94][95][96][97][98][99][100]. It is important to note that date o...…”
Section: Composite Review Of Mop Techniques With Taxonomymentioning
confidence: 99%
“…The decision maker can then select the best or final solution among the Pareto points based on the expert knowledge or a meta-heuristic technique such as fuzzy satisfying method. References [19][20][21][22] use this technique for various multi-objective problems. Given an optimisation problem with two objectives, a Pareto point corresponds to a solution in which by fixing the value of each objective, there is no better solution for the other one.…”
Section: Generating the Pareto Frontmentioning
confidence: 99%
“…8). 4 Complementary, DGs setpoint also can be defined as function of the day. The day/load level control can be automatically realized by a local device (does not need online communications between DGs and DNOs), defining the optimal operation mode according to the day (e.g., working days, weekends, holidays) and the load level (e.g., stratified in 1h steps).…”
Section: Feeder #1mentioning
confidence: 99%
“…In [3] is shown a technical planning methodology at electrical power substation level, using Particle Swarm Optimization algorithm to find the optimal placement of power substations, considering the presence of DGs, to reduce the peak demand. In [4] is shown a methodology to combine network expansion costs reduction and network reliability, when occurs a permanent fault. In [5] is proposed a mixed-integer optimization model to decide between centralized and decentralized generation sources for new energy infrastructure development.…”
Section: Introductionmentioning
confidence: 99%