“…(10) Then, the output power of each inverter unit is controlled as shown in (11). (11) State IV: The total load is larger than the sum of the total PVmaximum power and the total battery discharging power limits, as shown in (12). (12) With the condition of (12), the whole microgrid is overloaded,with all PV units operating at MPP and the batteries discharged with the power limits.The inverter enters in PCM, and its output power is controlled as shown in (13).…”