2018
DOI: 10.1016/j.scitotenv.2017.12.087
|View full text |Cite
|
Sign up to set email alerts
|

Population mobility and urban wastewater dynamics

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
24
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 29 publications
(26 citation statements)
references
References 57 publications
0
24
0
Order By: Relevance
“…The BSM2 plant comprises primary clarification and activated sludge process units in the water line and anaerobic digestion, thickening and dewatering operations in the sludge line (Figure 1). The plant is designed for an average influent dry weather flow rate of 20,648.36 m 3 /d and an average biodegradable chemical oxygen demand (COD) in the influent of 592.53 g/m 3 . Its hydraulic retention time, computed considering average dry weather flow rate and total tank volume of 18,900 m 3 , is 22 h (total tank volume includes: primary clarifier (900 m 3 ) + biological reactor (12,000 m 3 ) + secondary clarifier (6000 m 3 )) [18,19].…”
Section: Description Of the Wastewater Treatment Plant And Control Strategies Benchmark Simulation Model No 2 (Bsm2) Platformmentioning
confidence: 99%
See 2 more Smart Citations
“…The BSM2 plant comprises primary clarification and activated sludge process units in the water line and anaerobic digestion, thickening and dewatering operations in the sludge line (Figure 1). The plant is designed for an average influent dry weather flow rate of 20,648.36 m 3 /d and an average biodegradable chemical oxygen demand (COD) in the influent of 592.53 g/m 3 . Its hydraulic retention time, computed considering average dry weather flow rate and total tank volume of 18,900 m 3 , is 22 h (total tank volume includes: primary clarifier (900 m 3 ) + biological reactor (12,000 m 3 ) + secondary clarifier (6000 m 3 )) [18,19].…”
Section: Description Of the Wastewater Treatment Plant And Control Strategies Benchmark Simulation Model No 2 (Bsm2) Platformmentioning
confidence: 99%
“…The objective of operation strategy is to maintain levels of pollutants in the effluent, such as Nitrogen (N tot ), ammonium (S NH ), nitrates (S NO ), total chemical oxygen demand (COD t ), total suspended solids (TSS) and biological oxygen demand (BOD5), bellow the limits given by effluent quality requirements. The indicators considered in this work are given by BSM2 platform [17][18][19]: N tot < 18 gN/m 3 , S NH < 4 gN/m 3 , COD t < 100 gCOD/m 3 .…”
mentioning
confidence: 99%
See 1 more Smart Citation
“…In this way, to increase the conductivity and to evaluate the effect of the supporting electrolyte on the ATL abatement, different sodium sulfate concentrations were tested: 0.014, 0.028 and 0.056 M of Na 2 SO 4 . The pH of the working solution was set in 9 for all experiments with NaOH 2 M, when necessary, since the pH of the post-treatment municipal wastewater is neutral or weakly basic (Atinkpahoun et al, 2018).…”
Section: Chemicals and Solutionsmentioning
confidence: 99%
“…The key driver of household water consumption in an area is the total population. Census data are commonly used to inform household consumption in the context of wastewater (Blokker et al, 2010;Atinkpahoun et al, 2018). In addition, the UK census data is freely available anywhere in the UK (Office for National Statistics, 2011), and conducive toward reproducible research through the Office for National Statistics' API (Smith, 2017).…”
Section: A Population Presence Model For the Ukmentioning
confidence: 99%