2021
DOI: 10.1016/j.autcon.2021.103551
|View full text |Cite
|
Sign up to set email alerts
|

Planning for terrestrial laser scanning in construction: A review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
38
0
2

Year Published

2021
2021
2024
2024

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 98 publications
(63 citation statements)
references
References 78 publications
0
38
0
2
Order By: Relevance
“…Scan planning was formulated as a series of optimization problems, with three main elements to the optimization problems: inputs, controls, and optimization models. Aryan et al [ 269 ] reviewed prior publications based on these three problem elements and proposed three main data quality considerations: completeness, accuracy, and registrability.…”
Section: Critical Issues In Applicationmentioning
confidence: 99%
See 1 more Smart Citation
“…Scan planning was formulated as a series of optimization problems, with three main elements to the optimization problems: inputs, controls, and optimization models. Aryan et al [ 269 ] reviewed prior publications based on these three problem elements and proposed three main data quality considerations: completeness, accuracy, and registrability.…”
Section: Critical Issues In Applicationmentioning
confidence: 99%
“…Most of the existing publications solved medium-scale and generally simple problems [ 269 ], while working in real construction environments is difficult, owing to the more complicated set of limitations. Future research should be conducted to optimize the main elements in a functional model of scan planning, including: (a) exploring various kinds of input model matching the real environment well; (b) investigating the required data quality for specific applications and establishing the relationship between the required data quality and the scan parameters; (c) developing more optimal solutions for solving constrained nonlinear optimization problems; (d) using AI technologies and optimization algorithms to increase the level of automation and real-time adjustment to reduce manual intervention in data acquisition.…”
Section: Future Research Directionsmentioning
confidence: 99%
“…This calls into focus the process of planning to minimise the time on-site and maximise the integrity (i.e. quality and quantity) of the datasets (Aryan et al , 2021). Additional processing is also required to translate the unstructured point clouds into structured models using third-party applications to increase the value of the data set.…”
Section: Introductionmentioning
confidence: 99%
“…Besides, they are almost independent of lighting conditions. LS offers new possibilities for many applications such as Building Information Modelling (BIM), documentation of cultural heritage, infrastructure inspection, and additive manufacturing in construction (Aryan et al, 2021;Mattia Previtali et al, 2020;M. Maboudi et al, 2020).…”
Section: Introductionmentioning
confidence: 99%