2021
DOI: 10.46338/ijetae0721_07
|View full text |Cite
|
Sign up to set email alerts
|

Peculiarities of Implementing the State’s Strategic Narrative based on the Public Opinion

Abstract: The main purpose of the article is the peculiarities of implementing of the state’s strategic narrative based on the the statistical analysis of the public opinion. The scenarios of the public opinion development are forecasted. The main results are: the graphs of the statistical series of change in public opinion have been constructed; the approximating functions for the trend of change in public opinion have been determined; the parameters of the approximating function have been calculated; a point forecast … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…Figure 1 in [2] shows famous building life cycle with various components of information and material processes. Based on the analysis of scientific sources [13][14][15][16][17][18][19][20][21] Table 1 summarizes the basic requirements that a digital building model must meet in order to effectively manage it in the operational phase in the aspect of an integrated approach to implement the tasks of FM, PM and AM. In addition, the operational phase of the life cycle of a capital facility is mainly operational activity with periodic inclusion of investment for the implementation of development projects, overhaul and reconstruction of the property.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…Figure 1 in [2] shows famous building life cycle with various components of information and material processes. Based on the analysis of scientific sources [13][14][15][16][17][18][19][20][21] Table 1 summarizes the basic requirements that a digital building model must meet in order to effectively manage it in the operational phase in the aspect of an integrated approach to implement the tasks of FM, PM and AM. In addition, the operational phase of the life cycle of a capital facility is mainly operational activity with periodic inclusion of investment for the implementation of development projects, overhaul and reconstruction of the property.…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%