2021
DOI: 10.1109/access.2021.3056388
|View full text |Cite
|
Sign up to set email alerts
|

Abstract: In low latitudes, ice storage air conditioners (ISACs) have been widely used to cool while locally responding to the distribution network demand. However, due to the lack of the direct cold energy exchange between ISACs, the cooling load could only be shifted on the time scale instead of the space scale, resulting in an unsatisfactory regulation result. To address the above problem, this paper proposes a novel collaborative expansion planning scheme for integrated cooling and power system. Firstly, to increase… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 34 publications
0
2
0
Order By: Relevance
“…Substation contains many high-voltage electrical equipment such as transformers, circuit breakers, and voltage transformers, which are important components of power system supply and distribution [1]. When a substation encounters a severe vibration situation such as an earthquake, damage to high-voltage electrical equipment will cause the grid to lose its power supply and distribution functions, and power outage conditions enhance the di culty of resettling victims after a disaster [2,3].…”
Section: Introductionmentioning
confidence: 99%
“…Substation contains many high-voltage electrical equipment such as transformers, circuit breakers, and voltage transformers, which are important components of power system supply and distribution [1]. When a substation encounters a severe vibration situation such as an earthquake, damage to high-voltage electrical equipment will cause the grid to lose its power supply and distribution functions, and power outage conditions enhance the di culty of resettling victims after a disaster [2,3].…”
Section: Introductionmentioning
confidence: 99%
“…In the model solution, the model considering the interactions of DHSCOs, GENCOs, and ISO is handled based on decentralized decision-making processes. In addition, there are also some studies that carry out IES planning from the perspective of public utilities [11], grid auxiliary services [12], and latitude differences [13].…”
Section: Introductionmentioning
confidence: 99%