volume 16, issue 7, P485-497 1994
DOI: 10.1016/0141-0296(94)90085-x
View full text
|
|
Share
Giuliano Augusti, Antonio Borri, Marcello Ciampoli

Abstract: The optimization of preventive upgrading interventions on the bridges of a highway network in an earthquake prone area is tackled. The bridges are assumed to be the vulnerable elements of the network, whose main purpose is to connect two sites. If the probability of collapse of each bridge under an earthquake of given intensity is known, the topology of the network allows us to calculate its reliability, i.e., the probability of maintaining the connection between the source node and the destination node. To in…

expand abstract