2013
DOI: 10.1016/j.renene.2012.08.059
|View full text |Cite
|
Sign up to set email alerts
|

Operational expenditure costs for wave energy projects and impacts on financial returns

Abstract: Access to the full text of the published version may require a subscription. Rights

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

1
49
0
2

Year Published

2016
2016
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 66 publications
(52 citation statements)
references
References 8 publications
1
49
0
2
Order By: Relevance
“…Firstly, an explanation of the device and the rating adaptation for the power matrices is given. Secondly, the economic tool used for this analysis is presented following O'Connor et al [6] and, finally, the sites examined in this study are described.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…Firstly, an explanation of the device and the rating adaptation for the power matrices is given. Secondly, the economic tool used for this analysis is presented following O'Connor et al [6] and, finally, the sites examined in this study are described.…”
Section: Methodsmentioning
confidence: 99%
“…Secondly, the OPEX was calculated as a percentage of the CAPEX following [6,7]. However, this approach is inaccurate as it relies on the CAPEX calculation and does not take into account the number of devices per MW, which is a key parameter for the sizing study.…”
Section: Sensitivity Analysis: Capex and Opexmentioning
confidence: 99%
See 2 more Smart Citations
“…The reason can be mostly attributed to the high production costs, compared to other renewable energies technologies, as result of the large environmental forces to which WECs are exposed. Several studies have been carried out regarding the economic analysis of these devices, which is one of the main fields of research in marine renewable energy (e.g., [13][14][15][16][17][18][19][20][21][22][23]). Both the social acceptance of a WEC and the economic appeal for investors and utility providers remain heavily dependent on costs vs. payback analysis, that means competitively priced electricity supplies and reliability.…”
Section: Introductionmentioning
confidence: 99%