2015
DOI: 10.1109/tia.2014.2327151
|View full text |Cite
|
Sign up to set email alerts
|

Open-Switch Fault Detection Method of a Back-to-Back Converter Using NPC Topology for Wind Turbine Systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
62
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
4
4

Relationship

1
7

Authors

Journals

citations
Cited by 148 publications
(62 citation statements)
references
References 23 publications
0
62
0
Order By: Relevance
“…Thus, the reference current vector should be calculated with equation (5) by one more iteration for the next time step. Thus, to compensate the delay for the proposed HMPVC strategy, the prediction model in (4) is modified as (12), which helps reduce the control error by predicting the reference voltage vector at time step k+2.…”
Section: A Verification Of the Compensation Methods Of The Time Delaymentioning
confidence: 99%
See 1 more Smart Citation
“…Thus, the reference current vector should be calculated with equation (5) by one more iteration for the next time step. Thus, to compensate the delay for the proposed HMPVC strategy, the prediction model in (4) is modified as (12), which helps reduce the control error by predicting the reference voltage vector at time step k+2.…”
Section: A Verification Of the Compensation Methods Of The Time Delaymentioning
confidence: 99%
“…With three-level NPC converters, the drive systems can easily achieve high performances due to its effective use of four-quadrant operation under an alternative back-to-back configuration [12]. However, due to the voltage ratings of the available high-power switching devices, the three-level NPC is mostly applied in commercial applications with line-to-line output voltages below 6 kV, such as drive systems with 3.3 kV and 4.16 kV output voltages.…”
Section: Introductionmentioning
confidence: 99%
“…In the grid-connected IMC, power generated by the generator of the GS is directly transmitted to the three-phase grid without the energy storage elements. Therefore, under unbalanced grid voltage conditions, the apparent electric power (S) generated by the generator of the GS can be calculated using V p dq , I p dq , V n dq , and I n dq as in Equation (6).…”
Section: Determination Of Reference Currents For Balanced Currents Ofmentioning
confidence: 99%
“…It consists of a rectifier stage, inverter stage, and DC-link stage as energy storage elements. Therefore, a B2B converter is an AC-DC-AC indirect power conversion system; furthermore, it has disadvantages such as a bulky size and short lifetime because of the DC-link capacitors [6][7][8][9][10].…”
Section: Introductionmentioning
confidence: 99%
“…Many diagnosis methods have been proposed in the recent literature to identify the open-circuit fault of power transistors and diodes utilized in the three-level NPC converter [5,6,7,8,9,10]. Some of the diagnosis and faulty components identification methods are based on the analysis of the instantaneous pole voltage and its duration [5], as well as the currents in the dc-bus neutral point.…”
Section: Introductionmentioning
confidence: 99%