2015
DOI: 10.1080/00207543.2015.1126371
|View full text |Cite
|
Sign up to set email alerts
|

Open shop scheduling problem with a multi-skills resource constraint: a genetic algorithm and an ant colony optimisation approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
14
0

Year Published

2015
2015
2023
2023

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 27 publications
(15 citation statements)
references
References 52 publications
0
14
0
Order By: Relevance
“…Evolutionary heuristic methods make it possible to model dynamic integrated forward/reverse logistics network for 3rd party logistics (3PL) providers, where GA optimizes the network plan to help in the determination of resource plans for capacities of technical and human resources [9]. Ant colony based heuristics support open shop scheduling problems with a multi-skills resource constraint [10] and the solution of operating room surgery scheduling [11]. Scheduling of temporary and skilled-workers in dynamic cellular manufacturing systems can be solved by hybrid algorithms [12].…”
Section: State Of the Art In Human Resource Researchmentioning
confidence: 99%
“…Evolutionary heuristic methods make it possible to model dynamic integrated forward/reverse logistics network for 3rd party logistics (3PL) providers, where GA optimizes the network plan to help in the determination of resource plans for capacities of technical and human resources [9]. Ant colony based heuristics support open shop scheduling problems with a multi-skills resource constraint [10] and the solution of operating room surgery scheduling [11]. Scheduling of temporary and skilled-workers in dynamic cellular manufacturing systems can be solved by hybrid algorithms [12].…”
Section: State Of the Art In Human Resource Researchmentioning
confidence: 99%
“…Due to the numerous parameters to set in an ACO and their strong influence on the quality of results, Yalaoui et al (2010) and Yalaoui et al (2013) decided to apply fuzzy logic controllers to cope with the tuning of parameters. As they got good results, we decide to adapt this solution method to the open shop scheduling problem with resource constraints, developing a fuzzy-ACO algorithm which presents the parameters and modifications of an ACO that have already been explained by Campos-Ciro et al (2014). The complete algorithm procedure is detailed hereafter:…”
Section: Proposed Fuzzy Ant Colony Optimization Algorithmmentioning
confidence: 99%
“…We expose the problem with a mixed integer linear programming model that is used in Campos-Ciro et al (2014) to get optimal solutions of the described problem. The parameters related to the lists of skills are inspired by other authors who solved the multi-skill scheduling problems as Montoya (2012).…”
Section: Problem Formulationmentioning
confidence: 99%
See 1 more Smart Citation
“…Reference [27] used the ant colony algorithm to solve the rebalancing problem of the production line. In solving the scheduling problem of the production floor, reference [28] used genetic algorithms and ant colony algorithms to solve scheduling problems. Considering the problem of cargo recovery, reference [29] designed a hybrid ant colony algorithm to solve the problem of path optimization in such cases.…”
Section: Introductionmentioning
confidence: 99%