1999
DOI: 10.1061/(asce)0733-947x(1999)125:5(456)
|View full text |Cite
|
Sign up to set email alerts
|

Multistage Optimization of Reconstruction Sequence of Highways

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
6
0

Year Published

2000
2000
2017
2017

Publication Types

Select...
6
1
1

Relationship

0
8

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 9 publications
0
6
0
Order By: Relevance
“…Computer programs such as FORTRAN 77 have been used for aspects of highway optimization design, but did not integrate CAD drawings (Dhillon 1991). Computer programs have also been used in the past for optimizing of road network planning (Kiyota 1999). Others researched used algorithms with geographic information systems (GIS) to optimize highway alignment for cost effectiveness and proper time management (Jha et al 2004 andKang et al 2011).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Computer programs such as FORTRAN 77 have been used for aspects of highway optimization design, but did not integrate CAD drawings (Dhillon 1991). Computer programs have also been used in the past for optimizing of road network planning (Kiyota 1999). Others researched used algorithms with geographic information systems (GIS) to optimize highway alignment for cost effectiveness and proper time management (Jha et al 2004 andKang et al 2011).…”
Section: Literature Reviewmentioning
confidence: 99%
“…• Select an efficient sequence of bridge repairs. This algorithm may be either heuristic or an optimum-seeking dynamic program (Kiyota, Vandebona, and Tauoue 1999). • Estimate network cost improvements as cluster repair benefits associated with the repair sequence.…”
Section: Policy Tests: Earthquake Impacts With Alternative Reconstrucmentioning
confidence: 99%
“…The disruption of a transportation network can have substantial consequences on an economy, either at a local, regional, or national level (Kim et al, 2002;Ham et al, 2005a, Ham et al, 2005b, Sohn et al, 2003. Given these impacts, research has been conducted to aid engineers and planners in finding optimized reconstruction schedules following such disruptions (Lee and Kim, 2007;Chen and Tzeng, 1999;Kiyota et al, 1999) or identify network vulnerabilities (Matisziw and Murray, 2009;Ball et al, 1999). While useful for long-term planning, such research fails to address transient traffic dynamics in the short term.…”
Section: Introduction 11 Motivationmentioning
confidence: 99%