2016
DOI: 10.1007/978-3-319-29442-1
|View full text |Cite
|
Sign up to set email alerts
|

Monitoring and Evaluation of Production Processes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2016
2016
2020
2020

Publication Types

Select...
6
1
1

Relationship

1
7

Authors

Journals

citations
Cited by 19 publications
(14 citation statements)
references
References 0 publications
0
14
0
Order By: Relevance
“…Experimental modal analysis is based on the determination of the Frequency Response Function (FRF). This function expressing dynamic acceleration is given by the relation [9,10].…”
Section: Experimental and Numerical Analysismentioning
confidence: 99%
“…Experimental modal analysis is based on the determination of the Frequency Response Function (FRF). This function expressing dynamic acceleration is given by the relation [9,10].…”
Section: Experimental and Numerical Analysismentioning
confidence: 99%
“…CPS will be an essential building block of smart autonomous factories, capable of autonomously exchanging information, responding appropriately to good action, and controlling each other independently. Industry 4.0 anticipates mutual cooperation and communication between human -machine, man -man, machine -machine, even communication within logistics systems and products [Pandova 2016]. The entire production system and its environment -machines, production parts, sensors, computer systems -will be linked within a value chain that extends beyond the boundaries of a single company.…”
Section: Cps Architecture and Standardization Technologymentioning
confidence: 99%
“…The entire production system and its environment -machines, production parts, sensors, computer systems -will be linked within a value chain that extends beyond the boundaries of a single company. These linked CPS will interact with each other and standardize the data using standard Internet-based communication protocols to analyze data to anticipate any errors or failures, configure themselves and adapt to changed conditions in real time [Koderová 2016, Panda et al 2016.…”
Section: Cps Architecture and Standardization Technologymentioning
confidence: 99%
“…Average job time means the time duration of each operation. The separation dura-tion is 15 minutes, with 55 minutes of homogenization, between itself kneading and pressing [11], does not carry worker in any occupation, at last operation which is in preparation for compression and selection composite form working it is an average of 20 minutes. Table 6 presented statistical data for the conveyor that was used by manipulation from pressing machine, when we have the finished product [13] to the warehouse where they stored our plates before further analysis that will follow after compos-ite manufacture.…”
Section: Witness Simulation Programmentioning
confidence: 99%