2011
DOI: 10.1109/edocw.2011.10
View full text
|
Sign up to set email alerts
|
Share

Abstract: Concurrent engineering is a keyword in today's enterprises. Almost every enterprise parallelizes its engineering processes to reach a higher efficiency in designing their products. Unfortunately, the time-and cost-saving potential of concurrent engineering cannot be used to its full capacity. In fact, design problems arise and lead to a lot of rework. As we have recognized, design problems always affect the underlying data. Thus, wrong data is an indication of such problems. As a consequence, the improvement …

Expand abstract