Mengukur Efisiensi Lintasan Dan Stasiun Kerja Menggunakan Metode Line Balancing Studi Kasus Pt. Xyz

Abstract: ABSTRAK PT. XYZ merupakan salah satu perusahaan Jepang yang berproduksi berdasarkan pesanan (make to order) dan sangat mengedepankan kualitas, karenanya perusahaan berusaha secara maksimal untuk terus melakukan peningkatan kualitas dan kuantitas produksinya supaya terus mendapat kepercayaan dari para konsumen. Peningkatan tersebut dapat diperoleh dengan cara memperbaiki proses produksi yang masih terhambat dengan cara menyeimbangkan lintasan, menambah tenaga kerja atau menambah mesin-mesin yang sudah tersedia.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
2
0
1

Year Published

2020
2020
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 1 publication
0
2
0
1
Order By: Relevance
“…3. Smoothness Index A certain production line's relative smoothness in balancing is measured by a metric called the Smoothness Index (Trenggonowati & Febriana, 2019). A smoothness index value that is near to zero indicates an excellent production line.…”
Section: Line Efficiencymentioning
confidence: 99%
See 1 more Smart Citation
“…3. Smoothness Index A certain production line's relative smoothness in balancing is measured by a metric called the Smoothness Index (Trenggonowati & Febriana, 2019). A smoothness index value that is near to zero indicates an excellent production line.…”
Section: Line Efficiencymentioning
confidence: 99%
“…The existing processes on the production floor are considered to be still not optimal due to an imbalance in the production process which results in a long time to complete a job. Similar to work element 3, it has the largest and longest manufacturing process, which causes a build-up of raw materials and idle time for the following work element (Trenggonowati & Febriana, 2019). Given the foregoing context, it is clear that the challenge is formulated as: What is the present level of production line efficiency at X Inc?…”
Section: Introductionmentioning
confidence: 99%
“…Semua work station sedapat mungkin harus memiliki waktu siklus yang sama. Waktu siklus adalah waktu yang diperlukan untuk membuat satu unit produk pada work station (Trenggonowati, 2019). Proses keseimbangan lintasan bertujuan untuk meningkatkan efisiensi waktu work station dan meminimalkan balance delay (Ekoanaindiyo, 2017).…”
Section: A Line Balancingunclassified